|
1/1/2003 |
|
1 |
 |
The Basement Entrance to the QCSME Layout
"Watch Those Steps! They are taller than they are
wide."
|
|
2 |
 |
The Original Basement Condition
"Construction Begins."
|
|
3 |
 |
The Framing for Midland Yard
"Studs are in for the back wall of Midland Yard."
|
|
4 |
 |
The Framing for Knox
"Studs are in for the back wall of Knox."
|
|
5 |
 |
Newton Construction
"Dave Piskorik and Eric Viall putting in the backdrop for
Newton."
|
|
6 |
 |
Newton Entrance Construction
"Construction continues at the entrance to Newton."
|
|
7 |
 |
Newton Entrance Construction
"Construction continues at the entrance to Newton."
|
|
8 |
 |
Eric Viall Working on Midland Yard
"Midland Yard Entrance Track is Laid."
|
|
9 |
 |
John Weber Working on Midland Yard
"Midland Yard Background is Framed."
|
|
10 |
 |
Midland Yard
"Classification Tracks are completed."
|
|
11 |
 |
Colfax to Midland Yard
"Full view of Colfax to Seward Interchange to Midland Yard
(on right).""
|
|
12 |
 |
Colfax Spline Roadbed
"Clips holding Colfax Spline Roadbed in Place."
|
|
13 |
 |
Colfax To Seward Interchange
"Clips holding Colfax Spline Roadbed Next to Future Seward
Interchange."
|
|
14 |
 |
Colfax To Seward Interchange to Midland Yard
"The full view of the Colfax to Midland Yard Loop."
|
|
15 |
 |
Randy's Curve Under Construction
"The backdrop is in for Randy's Curve."
|
|
16 |
 |
Henry to Morris Loop
"Just a few studs are in for the future loop of Henry (on
left) to Morris (on right)."
|
|
17 |
 |
Midland Yard
"Ron Rahn and John Weber working on Midland Yard."
|
|
18 |
 |
Midland Yard from Randy's Curve
"Mike Johnson and John Weber Looking Over Randy's Curve."
|
|
19 |
 |
Eric Viall's Hand
"Apparently Not a Good Photo Opportunity ..."
|
|
20 |
 |
Bill Rupert and John Weber At Midland Yard
"Both men are fixing the track at the entrance to Midland
Yard."
|
|
21 |
 |
John Weber, Ken Roehrs and Mike Johnson At Midland
Yard
"More construction at Midland Yard."
|
|
22 |
 |
Ken Roehrs Working at Red Rock
"Ken Roehrs putting in the wiring at Red Rock (Power
Plant)."
|
|
23 |
 |
Mike Johnson and John Weber at Horseshoe Curve
"The long siding on the loop (Horseshoe) is the other
entrance to Midland Yard."
|
|
24 |
 |
Bill Rupert repairing a turnout
"Bill Rupert repairing a turnout a the temporary repair table."
|
|
25 |
 |
Randy's Curve
"Mike Johnson, Ron Rahn, Tom Rasmussen & Bill Rupert working on
Randy's Curve."
|
|
26 |
 |
Bill Rupert & Eric Viall on Track Repair
"Bill Rupert & Eric Viall doing more track repair."
|
|
27 |
 |
First Wreck At Randy's Curve
"The infamous curve at the entrance to Midland Yard has claimed
more victims!"
|
|
28 |
 |
First Train at Midland Yard #1
"The first train going through Midland Yard."
|
|
29 |
 |
First Train at Midland Yard #2
"The first train going through Midland Yard."
|
|
30 |
 |
Bill Rupert With More Track Repair
"Is there money in the account for some new turnouts?"
|
|
31 |
 |
Future Home of Hidden Staging Yard
"The North Burlington / South Island Staging future location."
|
|
32 |
 |
Tom Rasmussen & Bill McQuitty
"Tom Rasmussen & Bill McQuitty just workin' on the railroad."
|
|
33 |
 |
No, its not a picture of my basement
"The boxed material salvaged from the previous layout."
|
|
34 |
 |
Temporary Track Repair Station
"This RIP is no longer in this part of the layout."
|
|
35 |
 |
Track Layout Plans #1
"The original track layout plans - mostly intact except for
Newton."
|
|
36 |
 |
Track Layout Plans #2
"The original track layout plans - mostly intact except for
Newton."
|
|
37 |
 |
Meeting Area
"The enclosed meeting area in the Southeast Corner."
|
|
38 |
 |
Full-Length Basement View
"With construction partially complete, this is a full-length
view of the basement."
|
|
39 |
 |
Meeting Area - Outside
"The space between the Meeting Area and Randy's Curve."
|
|
40 |
 |
Knox Under Construction
"The Knox mainline is in but not the spur track."
|
|
41 |
 |
Eagle Under Construction
"The Eagle mainline is in but not the spurs or sidings."
|
|
42 |
 |
Newton Under Construction
"The curve before entering Newton."
|
|
43 |
 |
Red Rock Under Construction
"Red Rock partially complete where the coal Power Plant will be
placed."
|
|
44 |
 |
Red Rock Backdrop
"The backdrop is nearly complete behind the power plant."
|
|
3/2/2003 |
|
45 |
 |
The First
Turnout at Midland Yard
"Only 200 more to Go!"
|
|
9/22/2003 |
|
46 |
 |
Putting in the
Layout Bench Work
"My post is level, it must be the floor that is crooked."
|
|
47 |
 |
Building
Midland Yard
"Now if I could just find my switcher."
|
| 48 |
 |
Securing the
2x4s
Dave: "This is how high the flood of 1965 reached."
|
|
49 |
 |
Mike and Tom Building the Knox Area
"Hey, it's your turn to plaster."
|
|
50 |
 |
Mike and Tom
Building the Knox Area Scenery
"Lord, please don't let me spill plaster on the tracks ..."
|
|
51 |
 |
Ron and Dave
in the RIP Area
"Ron: We only need 1000 more hoppers and we're good."
|